PIM Implementation at a Manufacturer: Where to Start and What the Steps Are

PIM implementation starts with two decisions: who owns the data and which output comes first. Then follow six steps: map the data and systems, model families and attributes, take a pilot product family to the first output, load the rest in waves, connect the ERP while the waves run, and cut over each output.

Two people from a chemical manufacturer's technical team check a sample bottle against a product sheet at a lab bench

PIM implementation, the project that brings a product information management (PIM) system into the company to feed the catalog, starts with two decisions: who owns the data, and which output, a file or a PDF, comes first.

Then follow six steps: (1) map the data and systems, (2) model families and attributes, (3) take a pilot product family to the first output, (4) load the rest in waves, (5) connect the ERP, which runs during the waves, and (6) cut over each output. The PIM implementation timeline comes from the pilot, which measures the hours the product records take.

What PIM Implementation Is, Once the System Has Been Chosen

PIM implementation is the project that gets the system ready for your company’s portfolio: modeling product families and attributes, configuring the outputs, loading and checking the product records, and training the people who will edit them. Implementing a PIM has a beginning and an end; maintaining the product records comes afterward, as routine work.

Product information management (PIM) is the practice of keeping the technical and commercial information about each product in a single record, and a PIM system is the software that supports that practice.

If your company is still comparing vendors, the PIM selection criteria come first.

The pace of a PIM implementation depends on the people who know the product. Checking whether the spec sheet for a hydraulic fitting has the right dimension takes someone from application engineering, who keeps answering customer questions while the product records wait.

How the PIM implementation steps are split between your company and the vendor varies by contract, and that split needs to be in writing before work starts.

Where to Start: One Owner and One Output

PIM implementation starts with two decisions: who owns the data, and which output comes first. Neither of them depends on a signed contract.

In a PIM implementation, the data owner is a named person with a mandate from leadership to decide which value counts when two departments disagree. The mandate includes freed-up hours from the people who check the data, so the owner doesn’t end up with only the title. Those hours come from people who serve customers or work on product development.

For the data owner role in a PIM implementation, name someone who already gathers product information for the catalog, in any department, as long as that person has direct access to leadership. That person settles disagreements between departments over a value, and technical values still come from engineering. If the same person also leads the implementation, their hours belong in the mandate.

At the start of a PIM implementation, the data owner brings together product marketing, application engineering, sales, and IT to agree on which department answers for each group of attributes and how many hours a week each one frees up.

An output of a PIM is any file, PDF, or catalog generated from the product records for someone to use. The first output is the one that hurts most today and has a real recipient who can send the errors back: the file in the template of a distributor willing to check it, the manufacturer’s rep’s PDF for one product line, or the digital catalog for that line.

In a PIM implementation, a goal like “complete product records” lets no one say when the work is done. The statement “the distributor file comes out of the PIM with no manual fixes” does, because the distributor either imports the file or sends it back. If the file covers several product lines, the pilot sign-off covers the pilot family’s part of it, and the statement is met at cutover.

The definition of done is the verifiable condition that closes out the first output of a PIM. Write the definition of done down and, next to it, the list of what stays out of the first load wave: without that list, the print catalog and the version in another language come back to the table in the middle of the pilot.

How to Implement a PIM System at a Manufacturer in Six Steps

Once the data owner is named and the first output is chosen, the recommended way to bring a PIM into a manufacturer is this six-step order: (1) map the data and systems, (2) model families and attributes, (3) take a pilot product family to the first output, (4) load the rest in waves, (5) connect the ERP, which runs during the waves, and (6) cut over each output.

In a PIM implementation, the pilot product family comes before the portfolio load and before the ERP connection, because without it the schedule is a guess. A plan that leaves the pilot for the end discovers model errors with the entire portfolio already loaded.

In this sequence, each step of a PIM implementation has a responsible department and an exit condition:

StepWho answers for it at a manufacturerThe step ends with
1. Map the data and systemsthe data owner, with IT and whoever builds the catalog todaya two-column document, field and system of record, closed for the fields of the first output
2. Model families and attributesproduct marketing and application engineeringa written attribute dictionary for the pilot product family, with the type, unit, and owning department of each attribute
3. Take the pilot product family to the first outputapplication engineering, with product marketing and salesthe recipient’s sign-off, hours logged by department, and model changes listed
4. Load the rest in wavesthe data owner, with the departments that own each group of attributesthe wave’s mandatory attributes filled in and checked
5. Connect the ERPIT, with the ERP vendoragreed fields tested on both ends, and a record of who maintains the connection when the ERP is upgraded
6. Cut over each outputthe data owner and salesold output switched off, its users trained, and the shadow spreadsheet archived

Department names vary by manufacturer: where there is no product marketing or application engineering department, read it as whoever builds the catalog today and whoever answers for the drawing or the spec sheet, such as product engineering.

1 – Map Where Each Piece of Data Lives and Which System Owns It

Data mapping for a PIM lists where each piece of information lives today and which system owns it. That inventory shows which of the copies of a spec sheet carries the current revision.

At a manufacturer without PLM or DAM, the answer to where each piece of technical catalog data comes from is the ERP, CAD files or lab reports, the shared folder, the file for the last catalog, each department’s spreadsheets, and the distributors’ templates.

The result of PIM data mapping is a two-column document listing each field and its system of record, completed first for the fields the first output needs. PIM integration with the ERP is decided in that document, even with the technical connection coming later, because the queue at IT and at the ERP vendor starts moving from it.

2 – Model Families and Attributes Before Loading

The model for a product family states which attributes each part number carries, with type, unit, and owning department. Loading before modeling means moving values out of the wrong fields later.

When modeling, work backward: what the first output requires defines the mandatory attributes of the pilot product family. Model that family completely and the others only in outline, because the pilot may change the model. Finalizing every product line first spends time on a structure no recipient has tested.

3 – Take a Pilot Product Family to the First Output

The pilot product family in a PIM implementation is a group of products of medium difficulty, with a real output and an available recipient, that goes through the entire implementation before the rest of the portfolio.

In the pilot, cleanse the pilot product family, load it, check it, generate the output, send it to the recipient, and listen to the feedback, logging each department’s hours.

The recipient of the first output may find what the internal team misses: a field the dictionary lacks, or a unit nobody questioned. Sales arranges that feedback in advance, because manufacturer’s reps and distributors don’t have to answer a test.

During the pilot, the part number, sales status, and packaging data the distributor’s template asks for come in through a spreadsheet exported from the ERP, with no integration yet, and that export is repeated before each output until the ERP is connected.

For the pilot, use a family of medium difficulty with a real output: the test before signing with a vendor uses the hardest family and measures whether the system can handle it. The easiest family hides the errors, and the hardest one skews the timeline math.

The cost of the pilot shows up at the progress meeting: leadership sees one family finished and the rest of the portfolio waiting, and someone may ask to skip the pilot. Answer with what the pilot delivers at that point: the first date with math behind it.

4 – Load the Rest in Waves, Cleansing Before Each Load

Loading in waves brings the portfolio into the PIM by groups of product families, in the order of the outputs and of commercial value. The hardest family goes in early, while there is still time to adjust the model. A product launched during the waves goes straight into the PIM.

Product data cleansing is the correction of product data that already exists, and it happens wave by wave: each group of families is cleansed right before its own load. Because AI-generated product descriptions depend on filled-in attributes, AI doesn’t replace cleansing.

Once a family is in the PIM, it is edited only there. Until cutover, the spreadsheet that feeds the old output receives values exported from the PIM, and nobody types into it. Until the last wave, two versions coexist, and the data owner keeps the list of which family is in which place, so sales doesn’t answer with old data.

5 – Connect the ERP Once the Model Stops Changing

PIM integration with the ERP comes after the pilot and can proceed during the waves, because connecting earlier means redoing the mapping of fields that are still going to change.

When the catalog is integrated with the ERP, a change made in the ERP to an integrated field reaches the catalog without re-keying. Which fields are included, and in which direction they flow, is a project decision.

The order for connecting the ERP applies field by field: if the first output depends on a field that changes every week in the ERP, that field can come first.

6 – Cut Over Each Output, Train the People Who Use It, and Retire the Shadow Spreadsheet

Cutting over an output changes where it comes from: the distributor file or the manufacturer’s rep’s PDF stops being built in the spreadsheet and starts coming out of the PIM. Cut over one output at a time, on a set date and with notice to whoever receives it: a PDF that has already gone out to a manufacturer’s rep doesn’t come back.

Training is organized by role and follows use: people who edit learn during the pilot, before the first wave; people who approve and view-only users, close to cutover.

A shadow spreadsheet is the parallel spreadsheet a department keeps updating by hand to build an output after the PIM exists. Archive the shadow spreadsheet at the cutover of the output it fed: a spreadsheet that people still consult can turn back into the official version.

PIM implementation ends at the last cutover. Launches, revisions, and discontinuations become routine, with an owner.

How Long Does PIM Implementation Take: The Math From the Pilot

There is no reliable PIM implementation timeline before a pilot. The timeline comes from a calculation: the hours one pilot product family took from each department, extended to the portfolio and divided by the weekly hours that department frees up; the department with the most weeks sets the timeline.

Until the pilot ends, the only date you can promise leadership is the end of the pilot itself. The article on how much a PIM costs estimates hours for the budget; the schedule takes the full timeline calculation, in four steps.

  • Measure the pilot’s hours by department
  • Extend the result to the other product lines by what has to be checked one by one: an attribute shared by the whole family is checked once, and only what changes from part number to part number grows with the portfolio. A product line with very different attributes needs its own sample
  • Divide each department’s total by the weekly hours it actually frees up: the one with the most weeks is the bottleneck, and adding the departments together hides it
  • Add the cutover of the outputs, which comes after checking. The ERP connection runs with IT and the ERP vendor during the waves, and it counts only if it finishes after them. Take out of the calendar the department’s weeks of trade shows, launches, the month-end sales push, and vacation

A hypothetical chemical manufacturer, with made-up numbers, has 80 products in 6 product lines, each in up to four package sizes, from bottle to drum: about 260 part numbers. Two people from the technical team check attributes and data sheets.

At this made-up manufacturer, the pilot, on an average product line of 13 products, took 36 hours of that team’s time over three weeks, or 12 hours a week actually freed up.

At the made-up manufacturer, the math goes by product, because the package sizes repeat the same fields: about 2.8 hours each. In the made-up example, that leaves 67 products, about 185 hours. At the measured pace, 6 hours per person, the made-up math comes to about 15 weeks of checking after the pilot. At 10 hours per person, the same made-up math gives 20 hours a week and about 9 weeks.

In the made-up example, the six-week difference costs four hours a week from each person, taken from customer questions and the launch in progress, and that trade-off is what leadership decides. The made-up math covers only checking, without the ERP connection or the cutover of outputs. These made-up numbers are not a timeline benchmark.

The timeline math has two biases: the first product line is the slowest, which pushes the number up, and a line that is cleaner than it looks pushes it down. That’s why you revisit the implementation date when the first wave closes, with real hours.

Log the hours during the pilot, because hours reconstructed from memory bring back the guess. A spreadsheet with date, department, family, and hours is enough.

In a portfolio of thousands of part numbers, multiplying the pilot’s hours per part number by the whole portfolio can add up to years of checking. Before taking that estimate to leadership, separate what applies to the whole family.

When to Postpone PIM Implementation or Do It in Phases

These four situations change the plan for a PIM implementation: no data owner, an ERP replacement underway, a launch in the middle of the pilot, and a small portfolio.

  • No data owner: postpone the implementation. A data load done without an owner only moves the disagreement somewhere else
  • ERP replacement underway: postpone the data load, not the whole effort. Mapping and modeling proceed in parallel, and the load follows the ERP timeline, as in the article on product catalog ERP integration
  • A big launch or trade show in the middle of the pilot: move the pilot, if the engineers who check the product records are the same ones working on the launch
  • A few dozen part numbers and a single destination: the full implementation sequence may be more than you need; load everything at once and check it before cutting over the output

How Catallog Can Help

Catallog is a product information management platform built for the industrial value chain, with an emphasis on organizing the product portfolio, enabling the sales team, and generating leads. In the shorter form the market uses, Catallog is a PIM platform.

At Catallog, “Spreadsheet import” is included in all four plans listed on catallog.net/en/planos/ (November 2026).

At Catallog, attributes, descriptions, and media can be changed through bulk editing, processed in a queue, with a notification when the edit finishes. The availability of each feature depends on your plan.

At Catallog, title and description versions by channel derive from a single record of attributes, spec sheet, and media, without duplicating the product, and the platform generates structured exports by channel for the entire portfolio. The availability of each feature depends on your plan.

Catallog integrates with a variety of ERP systems, through different methods.

Catallog plans vary by number of items and admin users, and the plan comparison lists each plan’s limits, without prices.

The six PIM implementation steps in this article are a recommendation, not a vendor’s method. Who does what in each step, and on what timeline, is a question to ask any vendor, including Catallog.

To see your catalog’s profile by area, there is Catallog’s Product Catalog Maturity Assessment.

Frequently Asked Questions

How do you implement a PIM system at a manufacturer?

Implementing a PIM (product information management) system starts with two decisions: who owns the data, and which output, such as a distributor’s file, comes first. Then the manufacturer follows six steps: maps the data and systems, models families and attributes, takes a pilot product family to the first output, loads the rest in waves, connects the ERP while the waves run, and cuts over each output.

Where do you start a PIM implementation?

PIM (product information management) implementation starts with two decisions: who owns the data, and which output comes first. The data owner has a mandate from leadership to decide which value counts when two departments disagree. The first output, such as a distributor’s file, has a real recipient who sends the errors back, which gives the work a verifiable end point that a vague goal such as “complete product records” doesn’t.

How long does it take to implement a PIM system?

A PIM (product information management) implementation timeline can only be estimated after a pilot: the hours measured on one pilot product family are extended to the portfolio and divided, department by department, by the weekly hours each one frees up, and the department with the most weeks sets the timeline. The timeline also depends on the variety of product families, the state of the product records, and the integrations.

Do you need to clean up all your product data before implementing a PIM?

Product data for a PIM is cleansed in stages, not all before implementation: each group of product families is cleansed right before it is loaded into the PIM, after its attributes are modeled. Cleansing everything first delays the pilot and gives the product records time to change again.

Should ERP integration come before or after the PIM pilot?

Connect the PIM to the ERP once a pilot product family reaches its first output, while the rest of the portfolio loads, so field mapping isn’t redone while the data model still changes. The decision about what to integrate comes earlier, in the data mapping. The rule applies field by field: if the first output depends on a field that changes weekly in the ERP, that field can be connected first.

Conclusion

The first task of a PIM implementation fits on next week’s calendar: a meeting where you bring leadership a name for the data owner role and a first output, and leadership decides before any conversation about the schedule.

Come out of the first meeting with leadership with sales assigned to arrange who, at the distributor or among the manufacturer’s reps, will send back the first file. Without that arrangement, the pilot has no one to say it’s done.

With the data owner and the first output defined, you know what to ask any vendor, including us: talk to the Catallog team.

Free Catalog Assessment

Is Your Catalog Ready to Sell?

TAKE THE FREE ASSESSMENT NOW

Answer 8 questions about your catalog, enter your name and email, and get a profile for each area, with recommendations for your next step.

Author

Celso Ricardo Salazar Valentim, PhD

Specialist in knowledge management applied to product information governance. Works on structuring technical and commercial data for smart catalogs, helping manufacturers improve communication, sales efficiency and portfolio management.

Turn product information into smart catalogs

With Catallog, your company centralizes technical and commercial data, standardizes content, and automates the creation of digital catalogs, PDFs, and sales materials for representatives, distributors, and digital channels.

Discover the platform