{"id":1983,"date":"2026-10-29T09:00:00","date_gmt":"2026-10-29T12:00:00","guid":{"rendered":"https:\/\/catallog.net\/blog\/?p=1983"},"modified":"2026-10-29T09:00:00","modified_gmt":"2026-10-29T12:00:00","slug":"how-to-choose-a-pim-system","status":"publish","type":"post","link":"https:\/\/catallog.net\/blog\/en\/how-to-choose-a-pim-system\/","title":{"rendered":"How to Choose a PIM System for Manufacturing: What to Evaluate and How to Test It Before You Buy"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">To choose a PIM (product information management) system at a manufacturer, evaluate the data model for technical attributes and variants, the relationships between part numbers, the documents linked to each part number at the right revision, who edits and who approves, ERP integration field by field, outputs for the industrial channel from the same record, bulk loading, and total cost, and test the first seven with a product family from your company.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">How to choose a PIM system, the software that supports product information management, becomes a pressing question when the third vendor demo looks just like the first two, with the same well-built sample product and the same screens.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In this article, we show how to choose a PIM system using eight criteria, the question to ask the vendor for each one, and a script for testing the first seven with a real product family.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What You Choose When You Choose a PIM System<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Product information management (PIM) is the practice of keeping the technical and commercial information about each product in a single record, so that it reaches every channel and material where a company presents the product identical and up to date, and a PIM system is the software that supports that practice.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Choosing a PIM system comes after deciding that your company needs one, and the signs behind that decision are covered in <a href=\"https:\/\/catallog.net\/blog\/en\/what-is-product-information-management\/#when-a-manufacturer-needs-a-pim\">when a manufacturer needs a PIM<\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A PIM system is where a manufacturer keeps product information; product catalog software is how that information reaches the people who buy. Some platforms do both, but each job is evaluated with different questions.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A requirements spreadsheet doesn&#8217;t decide which PIM system to choose. On a feature list, PIM vendors tend to tie, and nearly all of them check &#8220;yes&#8221; for variants, import, export, and user roles.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">One PIM vendor stands apart from another through its data model: whether it can handle a real technical product family from your company, with the variants and exceptions that family has, and whether your team can maintain it after implementation. A requirements spreadsheet may be enough at a company with a few dozen part numbers and a single destination.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">At a midsize manufacturer, the comparison rarely stays among PIM vendors alone. Staying with the spreadsheet, using a product data module in the ERP, or asking IT for an in-house system are also on the table.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The alternatives to a PIM system look cheaper because the cost comes later: maintaining the data model when a new product family comes in, and maintaining each output when a distributor changes its template. The eight criteria for choosing a PIM system also apply to the spreadsheet, the ERP module, and the in-house system.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Eight PIM Selection Criteria for Manufacturers<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Of the eight criteria for choosing a PIM system, the first four, data model, relationships between part numbers, documents at the right revision, and editing and approval, depend on the data model and tend to decide the choice, because changing the model after the data load is expensive. The next four, integration, outputs, loading, and cost, tend to eliminate vendors more than break ties between them.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">1 \u2013 A Data Model That Can Handle an Entire Technical Product Family<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The data model is the way a PIM system organizes a product family: which attributes the family requires, which ones are mandatory, what type each one is, and in what unit of measure. A variation axis is an attribute whose values generate separate part numbers, such as wire diameter or finish.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In a hypothetical line of compression springs, with made-up numbers, ten wire diameters, eight free lengths, and three finishes make 240 part numbers in one product family, and 20 or 30 families like it add up to thousands of part numbers.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In a PIM system with thousands of part numbers, the data type decides whether the catalog can filter. Wire diameter is a number with a unit. Finish is a picklist, a closed list of values, because as free text it turns into &#8220;zinc plated,&#8221; &#8220;zinc pl.,&#8221; and &#8220;ZP&#8221; in the same column, and the filter shows three options for the same thing.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Attribute inheritance means a family-level value is entered once and applies to every part number in the family. In the spring example, the wire material is a family-level value, and free length belongs to each part number. With inheritance, a material change is a single edit.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A manufacturer that has already defined its taxonomy and the attributes for each product family should bring that definition to the demo.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Request: <em>&#8220;Set up a product family with three variation axes with me. Then change one family attribute and show me which part numbers changed.&#8221;<\/em><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">2 \u2013 Relationships Between Part Numbers<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Relationships between products are the links between one part number and others, such as a cross-reference, the replacement for a discontinued part number, an accessory, and a spare part.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Industrial customers keep ordering a discontinued part number years later, because that is the number in their plant&#8217;s purchasing records.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A relationship written as text in the description (&#8220;replaces the previous part number&#8221;) doesn&#8217;t become a column in the distributor&#8217;s file. A relationship recorded as a link between two records does, and it lets you find the part numbers that point to a replacement that has also been discontinued.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Ask: <em>&#8220;What happens to a discontinued part number, in the catalog and in the file that goes to the distributor?&#8221;<\/em><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">3 \u2013 Documents and Media Linked to the Part Number, at the Right Revision<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Engineering revises the drawing for a product family, the new file goes into the shared folder, and the PDF the manufacturer&#8217;s rep takes on a customer visit still has the old one. The documents criterion is whether drawings, spec sheets, manuals, and photos stay linked to the part number at the revision that applies today.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">At many manufacturers, the drawing leaves CAD for a shared folder, and someone carries it from there to the catalog; larger companies have a PLM or a DAM along the way. The map of <a href=\"https:\/\/catallog.net\/blog\/en\/pim-vs-dam-vs-plm\/#where-each-piece-of-technical-catalog-data-comes-from\">where each piece of technical catalog data comes from<\/a> shows the path with and without a PLM or a DAM. With any PIM system, a file that has already left the company stays as it left.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Ask: <em>&#8220;When engineering revises a drawing, how does the PIM find out, and what happens to the PDF that has already gone to the manufacturer&#8217;s rep?&#8221;<\/em><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">4 \u2013 Who Edits, Who Approves, and What Gets Recorded<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">When one to three people maintain the product records, what matters most is separating who changes a technical attribute, usually application engineering, from who changes the commercial copy. Change history comes right after, because it lets you undo a mistake without tracing it back through email.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Approval in a PIM system starts to matter when more than one department publishes. Approval can be enforced by the system, which keeps a change from taking effect without a recorded sign-off, or it can be a process rule, which depends on everyone remembering. During launch week, the process rule tends to fail first.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Ask: <em>&#8220;Is approval enforced by the system, or is it a process rule? Show me where I can see who changed an attribute and when.&#8221;<\/em><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">5 \u2013 ERP Integration, Field by Field<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">At a manufacturer, the part number originates in the ERP, with the invoice description, the tariff classification (HS code), and the sales status. Which product data the ERP holds is explained in <a href=\"https:\/\/catallog.net\/blog\/en\/product-catalog-erp-integration\/\">what the ERP covers and what it leaves out<\/a>, and which fields stay in each system in <a href=\"https:\/\/catallog.net\/blog\/en\/spreadsheet-erp-or-pim\/#what-stays-where-when-all-three-coexist\">what stays in the spreadsheet, the ERP, and the PIM<\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">When choosing a PIM system, the integration criterion is how the vendor connects the fields that originate in the ERP, such as the part number, invoice description, and sales status, to the PIM system: method, direction, frequency, and what happens when the same field differs between the two systems. A vendor answer without method and direction doesn&#8217;t yet describe the integration.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The cost of integration falls on both the ERP side and the PIM side: your IT team maps the fields, and someone maintains the mapping when the ERP is upgraded.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Ask: <em>&#8220;How would integration with our ERP work: by what method, in which direction, how often, and who maintains it when the ERP is upgraded?&#8221;<\/em><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">6 \u2013 Outputs for the Industrial Channel From the Same Record<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The distributor wants the file in its own column template. The manufacturer&#8217;s rep carries the PDF and the print catalog. A large customer asks for the same attributes in its supplier portal, under different field names, and the specifier downloads the spec sheet. Exporters add languages.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">When choosing a PIM system, the outputs criterion is whether the distributor file, the PDF, and the customer portal come out of the same product records, without duplicating the product for each destination. Generating the file solves half the problem, because the file still has to reach the distributor.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Request: <em>&#8220;Generate our largest distributor&#8217;s file and the PDF for the product line right now, from the same records, and show me what changes in both if I edit an attribute.&#8221;<\/em><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">7 \u2013 Initial Data Load and Bulk Maintenance<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The spreadsheet doesn&#8217;t disappear when the PIM system arrives; it becomes the tool for loading part numbers, during implementation and after it.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In a data load, what matters is what the import does with errors and with the second load. An import that accepts &#8220;zinc plated&#8221; and &#8220;ZP&#8221; without complaint brings the mess along, and an import that creates new part numbers when it receives the corrected spreadsheet, instead of updating the existing ones, duplicates the product records.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Request: <em>&#8220;Load our real spreadsheet, errors and all, and show me what gets rejected. Then load the corrected spreadsheet and show me what changed in the part numbers that already existed.&#8221;<\/em><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">8 \u2013 Total Cost and Scale<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The cost of a PIM system goes beyond the subscription, and the way each vendor counts items changes the math. An &#8220;item&#8221; can be a part number, a product family, or a variant, and a product family of 240 part numbers, like the one in the hypothetical example, can count as 240 items in one proposal and as one item in another.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Ask: <em>&#8220;How do you count items and users, and what happens to the price when we pass 5,000 part numbers?&#8221;<\/em><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How to Test the Criteria With One of Your Own Product Families<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A PIM system is tested with a real product family from your company, the hardest one, sent to the vendor before the demo along with a script of tasks that states what counts as a pass.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The test product family should have the most variation axes, a discontinued part number with a replacement, the same measurement published with different values in two places, and a recently revised drawing. It goes to the vendor a week ahead, with the spreadsheet as it is, because cleaning it up first hides what the test needs to show.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The test script links each demo task to a criterion and to what counts as a pass:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Demo task<\/th><th>Criterion tested<\/th><th>What counts as a pass<\/th><\/tr><\/thead><tbody><tr><td>Set up the product family with its variation axes<\/td><td>1. data model<\/td><td>the part numbers generated match the spreadsheet, and each attribute has a type and a unit<\/td><\/tr><tr><td>Change a family attribute<\/td><td>1. data model<\/td><td>the affected part numbers change together, and you can see which ones they were<\/td><\/tr><tr><td>Mark a part number as discontinued and name its replacement<\/td><td>2. relationships between part numbers<\/td><td>the replacement appears in the catalog and in a column of the distributor file<\/td><\/tr><tr><td>Replace the drawing with the new revision<\/td><td>3. documents at the right revision<\/td><td>only the new revision appears, and the next PDF generated already includes it<\/td><\/tr><tr><td>Show who made and who approved the last change<\/td><td>4. editing and approval<\/td><td>name and date visible on screen, without a request to support<\/td><\/tr><tr><td>Describe the integration with your ERP<\/td><td>5. ERP integration<\/td><td>method, direction, and frequency stated for the part number and for the sales status<\/td><\/tr><tr><td>Generate the distributor file and the manufacturer&#8217;s rep&#8217;s PDF<\/td><td>6. outputs<\/td><td>both come out of the same records, and a change to one attribute shows up in both<\/td><\/tr><tr><td>Load the real spreadsheet, then the corrected one<\/td><td>7. bulk loading<\/td><td>the row with an error is rejected with the reason, and the corrected spreadsheet updates the existing part numbers without duplicating them<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">In a PIM system test, product marketing, application engineering, sales, and IT each take part, with the script tasks each department checks and its &#8220;pass&#8221; written down before the first demo. Written afterward, the criterion adjusts itself to whichever vendor the room liked.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Leadership comes in before the departments: it frees up each department&#8217;s testing hours and signs off on the choice at the end. The test costs a few hours from each department per vendor, which is why it fits a shortlist of two or three vendors.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What the Demo Doesn&#8217;t Show<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A PIM demo doesn&#8217;t show product data cleansing, the decision about who owns each piece of data, or the initial data load, costs that come with any vendor and decide how long implementation takes, not which vendor to choose.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In the spring line in the hypothetical example, the wire diameter may be in inches on the website and in millimeters in one distributor&#8217;s file, with rounding in the conversion that makes the two values disagree. Engineering decides which value stands and corrects it before the data load, using time that would otherwise go to a project.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">No system decides which value stands when engineering and sales disagree. That decision belongs to a person at the company, and the mandate to make it comes from leadership, which also accepts the timeline for the cleansing.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The initial data load also takes hands-on work: someone builds the spreadsheet in the format of the chosen PIM system, product family by product family.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How Catallog Can Help<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/catallog.net\/en\/\">Catallog<\/a> is a product information management platform built for the industrial value chain, with an emphasis on organizing the product portfolio, enabling the sales team, and generating leads. In the shorter form the market uses, Catallog is a PIM platform.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In Catallog, each product&#8217;s channel versions derive from a single record of attributes, spec sheet, and media, without duplicating the product, and the platform generates structured exports by channel for the entire portfolio. Attributes, descriptions, and media can be changed through bulk editing, processed in a queue. In Catallog, the availability of each of these features depends on your plan.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Catallog plans vary by number of items and admin users, and the <a href=\"https:\/\/catallog.net\/en\/planos\/\">plan comparison<\/a> lists each plan&#8217;s limits, without prices. Catallog generates three catalog formats: digital, PDF, and print, and PDF and print are in the Advanced plan.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">&#8220;Spreadsheet import&#8221; is included in all four Catallog plans, Starter, Basic, Professional, and Advanced. At Catallog, pricing has a one-time implementation fee and a recurring fee.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For the four criteria that usually decide the choice, from the data model to approval, Catallog&#8217;s answers should be checked the same way as any other vendor&#8217;s: in a test with one of your company&#8217;s product families.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The <a href=\"https:\/\/tools.catallog.net\/diagnostico\/en\/?origem=blog-criterios-pim-en\">Product Catalog Maturity Assessment<\/a>, from Catallog, gives a product catalog a maturity profile across four areas. Knowing which area is weakest helps you decide which criterion for choosing a PIM system should carry the most weight.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Frequently Asked Questions<\/h2>\n\n\n\n<div class=\"schema-faq wp-block-yoast-faq-block\"><div class=\"schema-faq-section\" id=\"faq-question-1\"><strong class=\"schema-faq-question\">What criteria should a manufacturer use to choose a PIM system?<\/strong> <p class=\"schema-faq-answer\">The criteria a manufacturer should use to choose a PIM (product information management) system are the data model for technical attributes and variants, the relationships between part numbers, the documents linked to each part number at the right revision, who edits and who approves, ERP integration field by field, outputs for the industrial channel from the same record, bulk loading, and total cost. The first seven can be tested with a product family from the company, and cost is checked by asking how the vendor counts items and users.<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-2\"><strong class=\"schema-faq-question\">How do you test a PIM system before you buy it?<\/strong> <p class=\"schema-faq-answer\">A PIM system is tested with a real product family from the company, the hardest one, sent to the vendor before the demo along with a script of tasks that states what counts as a pass. The spreadsheet goes as it is today, and each department writes down its &#8220;pass&#8221; before the first meeting.<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-3\"><strong class=\"schema-faq-question\">Does a PIM system need a prebuilt connector for your ERP?<\/strong> <p class=\"schema-faq-answer\">A PIM system doesn&#8217;t need a prebuilt connector bearing the name of your company&#8217;s ERP: integration is evaluated by method, direction, frequency, and which system is the system of record for each field. When the catalog is integrated with the ERP, the change arrives without re-keying for the fields included in the integration, and which fields are included is decided in the project.<\/p> <\/div> <\/div>\n\n\n\n<h2 class=\"wp-block-heading\">Conclusion<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Send your hardest product family and the task script to each vendor a week before the next demo, and agree that the meeting starts with them; the sample product can wait. If a vendor asks to clean up the spreadsheet first, that request already says something about criterion 7, bulk loading.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">To discuss the criteria for choosing a PIM system before your next demo, <a href=\"https:\/\/catallog.net\/en\/contato\/\">talk to the Catallog team<\/a>.<\/p>\n\n\n<div id=\"wen-cta-1871\" class=\"wen-cta-wrap\"><div class=\"wen-cta-inner\"><div class=\"wen-cta-title\">Free Catalog Assessment<\/div><!-- .wen-cta-title --><div class=\"wen-cta-content\"><div class=\"cta-default cta1572\"><h4>Is Your Catalog Ready to Sell?<\/h4><a class=\"btn\" href=\"https:\/\/tools.catallog.net\/diagnostico\/en\/?origem=blog-en\" target=\"_blank\" rel=\"noopener\">TAKE THE FREE ASSESSMENT NOW<\/a><p>Answer 8 questions about your catalog, enter your name and email, and get a profile for each area, with recommendations for your next step.<\/p><\/div><\/div><!-- .wen-cta-content --><div class=\"wen-cta-button-wrap\"><\/div><!-- .wen-cta-button-wrap --><\/div><!-- .wen-cta-inner --><\/div>\n","protected":false},"excerpt":{"rendered":"<p>To choose a PIM (product information management) system at a manufacturer, evaluate the data model for technical attributes and variants, the relationships between part numbers, the documents linked to each part number at the right revision, who edits and who approves, ERP integration field by field, outputs for the industrial channel from the same record, bulk loading, and total cost, and test the first seven with a product family from your company.<\/p>\n","protected":false},"author":2,"featured_media":1987,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"catallog_atualizado_em":"","footnotes":""},"categories":[441],"tags":[],"class_list":["post-1983","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-pim-en"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>How to Choose a PIM System: 8 Criteria - Catallog | Blog<\/title>\n<meta name=\"description\" content=\"How to choose a PIM system as a manufacturer: technical data model, ERP integration, channel outputs, and how to test it with your own product family.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/catallog.net\/blog\/en\/how-to-choose-a-pim-system\/\" \/>\n<meta property=\"og:locale\" content=\"pt_BR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"How to Choose a PIM System: 8 Criteria - Catallog | Blog\" \/>\n<meta property=\"og:description\" content=\"How to choose a PIM system as a manufacturer: technical data model, ERP integration, channel outputs, and how to test it with your own product family.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/catallog.net\/blog\/en\/how-to-choose-a-pim-system\/\" \/>\n<meta property=\"og:site_name\" content=\"Catallog | Blog\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/catallogdigital\/\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-29T12:00:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/catallog.net\/blog\/wp-content\/uploads\/2026\/10\/How-to-choose-a-PIM-system-cover.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1440\" \/>\n\t<meta property=\"og:image:height\" content=\"900\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Celso Ricardo Salazar Valentim, PhD\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@catallogdigital\" \/>\n<meta name=\"twitter:site\" content=\"@catallogdigital\" \/>\n<meta name=\"twitter:label1\" content=\"Escrito por\" \/>\n\t<meta name=\"twitter:data1\" content=\"Celso Ricardo Salazar Valentim, PhD\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. tempo de leitura\" \/>\n\t<meta name=\"twitter:data2\" content=\"14 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/catallog.net\\\/blog\\\/en\\\/how-to-choose-a-pim-system\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/catallog.net\\\/blog\\\/en\\\/how-to-choose-a-pim-system\\\/\"},\"author\":{\"name\":\"Celso Ricardo Salazar Valentim, PhD\",\"@id\":\"https:\\\/\\\/catallog.net\\\/blog\\\/#\\\/schema\\\/person\\\/ad38e00c7d346b31d6e6fc655415b9a7\"},\"headline\":\"How to Choose a PIM System for Manufacturing: What to Evaluate and How to Test It Before You Buy\",\"datePublished\":\"2026-10-29T12:00:00+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/catallog.net\\\/blog\\\/en\\\/how-to-choose-a-pim-system\\\/\"},\"wordCount\":2891,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/catallog.net\\\/blog\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/catallog.net\\\/blog\\\/en\\\/how-to-choose-a-pim-system\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/catallog.net\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/How-to-choose-a-PIM-system-cover.jpg\",\"articleSection\":[\"PIM\"],\"inLanguage\":\"pt-BR\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/catallog.net\\\/blog\\\/en\\\/how-to-choose-a-pim-system\\\/#respond\"]}]},{\"@type\":[\"WebPage\",\"FAQPage\"],\"@id\":\"https:\\\/\\\/catallog.net\\\/blog\\\/en\\\/how-to-choose-a-pim-system\\\/\",\"url\":\"https:\\\/\\\/catallog.net\\\/blog\\\/en\\\/how-to-choose-a-pim-system\\\/\",\"name\":\"How to Choose a PIM System: 8 Criteria - Catallog | Blog\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/catallog.net\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/catallog.net\\\/blog\\\/en\\\/how-to-choose-a-pim-system\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/catallog.net\\\/blog\\\/en\\\/how-to-choose-a-pim-system\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/catallog.net\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/How-to-choose-a-PIM-system-cover.jpg\",\"datePublished\":\"2026-10-29T12:00:00+00:00\",\"description\":\"How to choose a PIM system as a manufacturer: technical data model, ERP integration, channel outputs, and how to test it with your own product family.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/catallog.net\\\/blog\\\/en\\\/how-to-choose-a-pim-system\\\/#breadcrumb\"},\"mainEntity\":[{\"@id\":\"https:\\\/\\\/catallog.net\\\/blog\\\/en\\\/how-to-choose-a-pim-system\\\/#faq-question-1\"},{\"@id\":\"https:\\\/\\\/catallog.net\\\/blog\\\/en\\\/how-to-choose-a-pim-system\\\/#faq-question-2\"},{\"@id\":\"https:\\\/\\\/catallog.net\\\/blog\\\/en\\\/how-to-choose-a-pim-system\\\/#faq-question-3\"}],\"inLanguage\":\"pt-BR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/catallog.net\\\/blog\\\/en\\\/how-to-choose-a-pim-system\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-BR\",\"@id\":\"https:\\\/\\\/catallog.net\\\/blog\\\/en\\\/how-to-choose-a-pim-system\\\/#primaryimage\",\"url\":\"https:\\\/\\\/catallog.net\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/How-to-choose-a-PIM-system-cover.jpg\",\"contentUrl\":\"https:\\\/\\\/catallog.net\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/How-to-choose-a-PIM-system-cover.jpg\",\"width\":1440,\"height\":900,\"caption\":\"A spreadsheet for a family of compression springs on a laptop, next to a printed task checklist for a PIM system demo\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/catallog.net\\\/blog\\\/en\\\/how-to-choose-a-pim-system\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"In\u00edcio\",\"item\":\"https:\\\/\\\/catallog.net\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"How to Choose a PIM System for Manufacturing: What to Evaluate and How to Test It Before You Buy\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/catallog.net\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/catallog.net\\\/blog\\\/\",\"name\":\"Catallog | Blog\",\"description\":\"Gest\u00e3o de informa\u00e7\u00f5es de produtos para a cadeia de valor da ind\u00fastria\",\"publisher\":{\"@id\":\"https:\\\/\\\/catallog.net\\\/blog\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/catallog.net\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-BR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/catallog.net\\\/blog\\\/#organization\",\"name\":\"Catallog\",\"url\":\"https:\\\/\\\/catallog.net\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-BR\",\"@id\":\"https:\\\/\\\/catallog.net\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/catallog.net\\\/blog\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/catallog-blog.png\",\"contentUrl\":\"https:\\\/\\\/catallog.net\\\/blog\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/catallog-blog.png\",\"width\":245,\"height\":45,\"caption\":\"Catallog\"},\"image\":{\"@id\":\"https:\\\/\\\/catallog.net\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/catallogdigital\\\/\",\"https:\\\/\\\/x.com\\\/catallogdigital\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/catallogdigital\\\/\",\"https:\\\/\\\/www.instagram.com\\\/catallogdigital\\\/\",\"https:\\\/\\\/www.tiktok.com\\\/@catallogdigital\"],\"description\":\"A Catallog \u00e9 uma plataforma de gest\u00e3o de informa\u00e7\u00f5es de produtos dirigida \u00e0 cadeia de valor da ind\u00fastria, com \u00eanfase em organizar o portf\u00f3lio, habilitar a for\u00e7a de vendas e gerar leads.\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/catallog.net\\\/blog\\\/#\\\/schema\\\/person\\\/ad38e00c7d346b31d6e6fc655415b9a7\",\"name\":\"Celso Ricardo Salazar Valentim, PhD\",\"description\":\"Especialista em gest\u00e3o do conhecimento aplicada \u00e0 governan\u00e7a de informa\u00e7\u00f5es de produtos. Atua na estrutura\u00e7\u00e3o de dados t\u00e9cnicos e comerciais para cat\u00e1logos inteligentes, apoiando ind\u00fastrias na melhoria da comunica\u00e7\u00e3o, da efici\u00eancia comercial e da gest\u00e3o de portf\u00f3lios.\",\"url\":\"https:\\\/\\\/catallog.net\\\/blog\\\/author\\\/celso\\\/\"},{\"@type\":\"Question\",\"@id\":\"https:\\\/\\\/catallog.net\\\/blog\\\/en\\\/how-to-choose-a-pim-system\\\/#faq-question-1\",\"position\":1,\"url\":\"https:\\\/\\\/catallog.net\\\/blog\\\/en\\\/how-to-choose-a-pim-system\\\/#faq-question-1\",\"name\":\"What criteria should a manufacturer use to choose a PIM system?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The criteria a manufacturer should use to choose a PIM (product information management) system are the data model for technical attributes and variants, the relationships between part numbers, the documents linked to each part number at the right revision, who edits and who approves, ERP integration field by field, outputs for the industrial channel from the same record, bulk loading, and total cost. The first seven can be tested with a product family from the company, and cost is checked by asking how the vendor counts items and users.\",\"inLanguage\":\"pt-BR\"},\"inLanguage\":\"pt-BR\"},{\"@type\":\"Question\",\"@id\":\"https:\\\/\\\/catallog.net\\\/blog\\\/en\\\/how-to-choose-a-pim-system\\\/#faq-question-2\",\"position\":2,\"url\":\"https:\\\/\\\/catallog.net\\\/blog\\\/en\\\/how-to-choose-a-pim-system\\\/#faq-question-2\",\"name\":\"How do you test a PIM system before you buy it?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"A PIM system is tested with a real product family from the company, the hardest one, sent to the vendor before the demo along with a script of tasks that states what counts as a pass. The spreadsheet goes as it is today, and each department writes down its \\\"pass\\\" before the first meeting.\",\"inLanguage\":\"pt-BR\"},\"inLanguage\":\"pt-BR\"},{\"@type\":\"Question\",\"@id\":\"https:\\\/\\\/catallog.net\\\/blog\\\/en\\\/how-to-choose-a-pim-system\\\/#faq-question-3\",\"position\":3,\"url\":\"https:\\\/\\\/catallog.net\\\/blog\\\/en\\\/how-to-choose-a-pim-system\\\/#faq-question-3\",\"name\":\"Does a PIM system need a prebuilt connector for your ERP?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"A PIM system doesn't need a prebuilt connector bearing the name of your company's ERP: integration is evaluated by method, direction, frequency, and which system is the system of record for each field. When the catalog is integrated with the ERP, the change arrives without re-keying for the fields included in the integration, and which fields are included is decided in the project.\",\"inLanguage\":\"pt-BR\"},\"inLanguage\":\"pt-BR\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"How to Choose a PIM System: 8 Criteria - Catallog | Blog","description":"How to choose a PIM system as a manufacturer: technical data model, ERP integration, channel outputs, and how to test it with your own product family.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/catallog.net\/blog\/en\/how-to-choose-a-pim-system\/","og_locale":"pt_BR","og_type":"article","og_title":"How to Choose a PIM System: 8 Criteria - Catallog | Blog","og_description":"How to choose a PIM system as a manufacturer: technical data model, ERP integration, channel outputs, and how to test it with your own product family.","og_url":"https:\/\/catallog.net\/blog\/en\/how-to-choose-a-pim-system\/","og_site_name":"Catallog | Blog","article_publisher":"https:\/\/www.facebook.com\/catallogdigital\/","article_published_time":"2026-10-29T12:00:00+00:00","og_image":[{"width":1440,"height":900,"url":"https:\/\/catallog.net\/blog\/wp-content\/uploads\/2026\/10\/How-to-choose-a-PIM-system-cover.jpg","type":"image\/jpeg"}],"author":"Celso Ricardo Salazar Valentim, PhD","twitter_card":"summary_large_image","twitter_creator":"@catallogdigital","twitter_site":"@catallogdigital","twitter_misc":{"Escrito por":"Celso Ricardo Salazar Valentim, PhD","Est. tempo de leitura":"14 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/catallog.net\/blog\/en\/how-to-choose-a-pim-system\/#article","isPartOf":{"@id":"https:\/\/catallog.net\/blog\/en\/how-to-choose-a-pim-system\/"},"author":{"name":"Celso Ricardo Salazar Valentim, PhD","@id":"https:\/\/catallog.net\/blog\/#\/schema\/person\/ad38e00c7d346b31d6e6fc655415b9a7"},"headline":"How to Choose a PIM System for Manufacturing: What to Evaluate and How to Test It Before You Buy","datePublished":"2026-10-29T12:00:00+00:00","mainEntityOfPage":{"@id":"https:\/\/catallog.net\/blog\/en\/how-to-choose-a-pim-system\/"},"wordCount":2891,"commentCount":0,"publisher":{"@id":"https:\/\/catallog.net\/blog\/#organization"},"image":{"@id":"https:\/\/catallog.net\/blog\/en\/how-to-choose-a-pim-system\/#primaryimage"},"thumbnailUrl":"https:\/\/catallog.net\/blog\/wp-content\/uploads\/2026\/10\/How-to-choose-a-PIM-system-cover.jpg","articleSection":["PIM"],"inLanguage":"pt-BR","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/catallog.net\/blog\/en\/how-to-choose-a-pim-system\/#respond"]}]},{"@type":["WebPage","FAQPage"],"@id":"https:\/\/catallog.net\/blog\/en\/how-to-choose-a-pim-system\/","url":"https:\/\/catallog.net\/blog\/en\/how-to-choose-a-pim-system\/","name":"How to Choose a PIM System: 8 Criteria - Catallog | Blog","isPartOf":{"@id":"https:\/\/catallog.net\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/catallog.net\/blog\/en\/how-to-choose-a-pim-system\/#primaryimage"},"image":{"@id":"https:\/\/catallog.net\/blog\/en\/how-to-choose-a-pim-system\/#primaryimage"},"thumbnailUrl":"https:\/\/catallog.net\/blog\/wp-content\/uploads\/2026\/10\/How-to-choose-a-PIM-system-cover.jpg","datePublished":"2026-10-29T12:00:00+00:00","description":"How to choose a PIM system as a manufacturer: technical data model, ERP integration, channel outputs, and how to test it with your own product family.","breadcrumb":{"@id":"https:\/\/catallog.net\/blog\/en\/how-to-choose-a-pim-system\/#breadcrumb"},"mainEntity":[{"@id":"https:\/\/catallog.net\/blog\/en\/how-to-choose-a-pim-system\/#faq-question-1"},{"@id":"https:\/\/catallog.net\/blog\/en\/how-to-choose-a-pim-system\/#faq-question-2"},{"@id":"https:\/\/catallog.net\/blog\/en\/how-to-choose-a-pim-system\/#faq-question-3"}],"inLanguage":"pt-BR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/catallog.net\/blog\/en\/how-to-choose-a-pim-system\/"]}]},{"@type":"ImageObject","inLanguage":"pt-BR","@id":"https:\/\/catallog.net\/blog\/en\/how-to-choose-a-pim-system\/#primaryimage","url":"https:\/\/catallog.net\/blog\/wp-content\/uploads\/2026\/10\/How-to-choose-a-PIM-system-cover.jpg","contentUrl":"https:\/\/catallog.net\/blog\/wp-content\/uploads\/2026\/10\/How-to-choose-a-PIM-system-cover.jpg","width":1440,"height":900,"caption":"A spreadsheet for a family of compression springs on a laptop, next to a printed task checklist for a PIM system demo"},{"@type":"BreadcrumbList","@id":"https:\/\/catallog.net\/blog\/en\/how-to-choose-a-pim-system\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"In\u00edcio","item":"https:\/\/catallog.net\/blog\/"},{"@type":"ListItem","position":2,"name":"How to Choose a PIM System for Manufacturing: What to Evaluate and How to Test It Before You Buy"}]},{"@type":"WebSite","@id":"https:\/\/catallog.net\/blog\/#website","url":"https:\/\/catallog.net\/blog\/","name":"Catallog | Blog","description":"Gest\u00e3o de informa\u00e7\u00f5es de produtos para a cadeia de valor da ind\u00fastria","publisher":{"@id":"https:\/\/catallog.net\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/catallog.net\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-BR"},{"@type":"Organization","@id":"https:\/\/catallog.net\/blog\/#organization","name":"Catallog","url":"https:\/\/catallog.net\/","logo":{"@type":"ImageObject","inLanguage":"pt-BR","@id":"https:\/\/catallog.net\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/catallog.net\/blog\/wp-content\/uploads\/2025\/07\/catallog-blog.png","contentUrl":"https:\/\/catallog.net\/blog\/wp-content\/uploads\/2025\/07\/catallog-blog.png","width":245,"height":45,"caption":"Catallog"},"image":{"@id":"https:\/\/catallog.net\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/catallogdigital\/","https:\/\/x.com\/catallogdigital","https:\/\/www.linkedin.com\/company\/catallogdigital\/","https:\/\/www.instagram.com\/catallogdigital\/","https:\/\/www.tiktok.com\/@catallogdigital"],"description":"A Catallog \u00e9 uma plataforma de gest\u00e3o de informa\u00e7\u00f5es de produtos dirigida \u00e0 cadeia de valor da ind\u00fastria, com \u00eanfase em organizar o portf\u00f3lio, habilitar a for\u00e7a de vendas e gerar leads."},{"@type":"Person","@id":"https:\/\/catallog.net\/blog\/#\/schema\/person\/ad38e00c7d346b31d6e6fc655415b9a7","name":"Celso Ricardo Salazar Valentim, PhD","description":"Especialista em gest\u00e3o do conhecimento aplicada \u00e0 governan\u00e7a de informa\u00e7\u00f5es de produtos. Atua na estrutura\u00e7\u00e3o de dados t\u00e9cnicos e comerciais para cat\u00e1logos inteligentes, apoiando ind\u00fastrias na melhoria da comunica\u00e7\u00e3o, da efici\u00eancia comercial e da gest\u00e3o de portf\u00f3lios.","url":"https:\/\/catallog.net\/blog\/author\/celso\/"},{"@type":"Question","@id":"https:\/\/catallog.net\/blog\/en\/how-to-choose-a-pim-system\/#faq-question-1","position":1,"url":"https:\/\/catallog.net\/blog\/en\/how-to-choose-a-pim-system\/#faq-question-1","name":"What criteria should a manufacturer use to choose a PIM system?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"The criteria a manufacturer should use to choose a PIM (product information management) system are the data model for technical attributes and variants, the relationships between part numbers, the documents linked to each part number at the right revision, who edits and who approves, ERP integration field by field, outputs for the industrial channel from the same record, bulk loading, and total cost. The first seven can be tested with a product family from the company, and cost is checked by asking how the vendor counts items and users.","inLanguage":"pt-BR"},"inLanguage":"pt-BR"},{"@type":"Question","@id":"https:\/\/catallog.net\/blog\/en\/how-to-choose-a-pim-system\/#faq-question-2","position":2,"url":"https:\/\/catallog.net\/blog\/en\/how-to-choose-a-pim-system\/#faq-question-2","name":"How do you test a PIM system before you buy it?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"A PIM system is tested with a real product family from the company, the hardest one, sent to the vendor before the demo along with a script of tasks that states what counts as a pass. The spreadsheet goes as it is today, and each department writes down its \"pass\" before the first meeting.","inLanguage":"pt-BR"},"inLanguage":"pt-BR"},{"@type":"Question","@id":"https:\/\/catallog.net\/blog\/en\/how-to-choose-a-pim-system\/#faq-question-3","position":3,"url":"https:\/\/catallog.net\/blog\/en\/how-to-choose-a-pim-system\/#faq-question-3","name":"Does a PIM system need a prebuilt connector for your ERP?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"A PIM system doesn't need a prebuilt connector bearing the name of your company's ERP: integration is evaluated by method, direction, frequency, and which system is the system of record for each field. When the catalog is integrated with the ERP, the change arrives without re-keying for the fields included in the integration, and which fields are included is decided in the project.","inLanguage":"pt-BR"},"inLanguage":"pt-BR"}]}},"read_time":15,"_links":{"self":[{"href":"https:\/\/catallog.net\/blog\/wp-json\/wp\/v2\/posts\/1983","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/catallog.net\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/catallog.net\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/catallog.net\/blog\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/catallog.net\/blog\/wp-json\/wp\/v2\/comments?post=1983"}],"version-history":[{"count":1,"href":"https:\/\/catallog.net\/blog\/wp-json\/wp\/v2\/posts\/1983\/revisions"}],"predecessor-version":[{"id":1995,"href":"https:\/\/catallog.net\/blog\/wp-json\/wp\/v2\/posts\/1983\/revisions\/1995"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/catallog.net\/blog\/wp-json\/wp\/v2\/media\/1987"}],"wp:attachment":[{"href":"https:\/\/catallog.net\/blog\/wp-json\/wp\/v2\/media?parent=1983"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/catallog.net\/blog\/wp-json\/wp\/v2\/categories?post=1983"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/catallog.net\/blog\/wp-json\/wp\/v2\/tags?post=1983"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}